This topic contains 45 replies, has 0 voices, and was last updated by  River Rat 2 years, 4 months ago.

Viewing 46 post (of 46 total)
  • Author
    Posts
  • #32266

    KEN
    Participant

    @Old Scout wrote:

    Looks like the work on the dam is complete. They are re landscaping the parking area and have resurfaced the temporary road they put in on the south side. Cleaned up the gravel and put in top soil and seeded it. They have put in top soil and seeded the back face of the dam and are putting gravel down in the parking area and fixing up the grass areas where the equipment was parked. Looks like it is complete and the water is only down a foot or so.

    Thanks for the update.

    I`ve noticed the water level, although lower then other flowages, was at an acceptable level.

    I was wondering if all the work was complete.

    Hopefully with plenty of rain, and lots of snow over the winter, it will remain at a full , or close to full, level. 😕

    Any idea as to how the fishing has been on The Spirit lately? 😉

Viewing 46 post (of 46 total)

You must be logged in to reply to this topic.